CASE STUDY

>

Client: Waitemata District Health Unit

Architect: Klein Architects Limited

Structural Engineer: KCL

Project Manager: RCP

Service Engineer: WSP

THE CHALLENGE

To construct additional bedrooms within the Muriwai and Wainamu Wards on a staged basis to manage minimum bed numbers throughout the project. The existing construction and as Built drawings were found to be very inaccurate and as such architectural, structural and services design had to be confirmed as the works were opened up.

THE SOLUTION

A key to the overall success of the project was  pre planning and daily morning pre start and afternoon close out meetings with key hospital staff to make them aware of the construction taking place each day and that planned for the next few days. This interface managed by our Site Manager was key to the smooth running of the project. Prior to new stages of the project being opened up consultants were advised to meet with RCC and key subcontractors to view the existing conditions and proposed details. These meetings were key in overcoming or minimising any delays with the existing structure, fire rating and services significantly different to the expected or as built documentation.

View next project Back to Case Studies

  • Marcus N Beveridge

    Principal, Queen City Law

    Rankin Mews

    “

    RCC Remediate achieved at every level, was cooperative to deal with, and entered into the contract as a partner of the client and project team.

    ”