CASE STUDY

>

Client: Saint Kentigern Trust Board

Project Manager: Watershed Group

Architect: RTA Studio

Quantity Surveyor: Davis Langdon – AECOM

Structural Engineer: Harris Foster Consulting

Consulting Mechanical Engineer: E Cubed

Electrical Engineer: ESC – Nick Topp

Project Description

This award winning 3 Level School Administration building including Trust Board Office, Staff Room  and Senior Students Café and Common Room was built by RCC on a compact site at the entry to the school grounds. The design required a high degree of structural and services coordination and the highest quality finishes. The RCC team worked closely with the Project Manager and Design team to ensure the project’s success. The project was delivered on the agreed timetable and the final account agreed shortly thereafter.

The Challenge

Construction of a high spec building which required a high degree of coordination between architectural, structural and services disciplines and delivery of the highest quality finishes.

The Solution

RCC Education worked closely with our key services trades to ensure coordination of the services with the other disciplines this sometimes required plant or ductwork to be repositioned. This coordination was in conjunction with the services consultants and was on going throughout construction. The high level of finishing was achieved through development of approved samples of finish and a well developed Quality Assurance Programme that was used throughout construction.

Client Perspective

“This was a challenging building with multiple uses and a collection of challenging and high quality materials and finishes. It also occupies a difficult site in the centre of a very busy populated operating campus. RCC produced a very high quality product with an excellent level of finish and detail”.

Richard Naish | Director RTA Studio

“RCC’s attention to detail and willingness to help find solutions to issues as they arose was excellent and recognised by all parties. This project called on the knowledge of an experienced contractor who was able to operate in a working school environment, which RCC through their years of experience in the educational sector, were able to provide. The RCC team always made themselves available which helped address any issues that arose promptly and efficiently. RCC delivered an outstanding result for the client and in the process impressed all parties involved with the project”.

Kris Morris – Vette | Managing Director Watershed – Project Management

View next project Back to Case Studies

  • Valerio Longone

    Owner & Body Corporate

    Farnham Terraces

    “

    The professionalism RCC has shown is a credit to your reputation. The level of communication during the contract was exemplary and your liaison with our consultants showed us you are a considered and responsible operator.

    ”

RCC