Job: Building 1 Remediation

Client: Windward Properties

Project Manager: Weiland Hand Property

Architect: Avery Team Architects Limited

 

THE CHALLENGE

The challenge with this project was to take a derelict commercial building with both seismic issues and asbestos and to create office suites, commercial storage units and car parking within a very tight budget

 

THE SOLUTION

RCC worked closely with the Project Manager, Architects and owner on different project schemes, structural options before finalising a project design, costings and moving forward with the construction phase. Value engineering construction and design options carried out by our Pre Construction Team and Quantity Surveyors were key to the successful delivery of this project. Innovative solutions adopted included diagonal steel k braces, panelised system in commercial storage units, carpark maximization and fire rating and systems evaluations

Client Perspective

“RCC Commercial were great to work with once again – this project was budget driven and their team worked closely with ourselves and the design team to deliver on budget, which was not easy given the asbestos, structural strengthening etc.”

Max Hand | Weiland Hand Property

Back to Case Studies

  • Brett Heaven

    Director, N-Compass

    Farnham Terraces

    “

    The project met the programme despite the numerous challenges with unexpected issues and multiple tenant / owner requests.

     

     

    ”