This project required the seismic upgrade and fitout for a state of the art dental practice within an existing occupied office building. Challenges included maintaining live services in the building and minimising disruption to the other tenants who included a video production company who required absolute quiet during certain hours.
The integration and co-ordination of services into the existing building were key to the success of the project which required completion within a very tight compressed programme.
The seismic upgrading of the building and fitout of third floor into a state of the art dental facility had to be achieved within the confines of an existing operational building which included a video recording studio. This meant that fire and safety systems had to remain operational at all times and construction noise was significantly limited to hours set by the recording studio.
The fitout included integration and coordination of specialty services, suppliers and contractors within a very compressed construction programme.
RCC Heathcare’s Site Manager worked closely with the building owners and other tenants in developing work practises and mini programmes that were relayed to all parties on a daily basis. Communication was one of the keys to the projects success in allowing work to continue whilst allowing the other tenants in particular the video recording studio to continue operations.
Working closely with the Alpers Dental management team, 22 Degrees and the specialty plant suppliers and contractors, we were able to programme the specialty fitout into the construction fitout which allowed Alpers Dental to open on time which was critical for them.
“RCC Healthcare was awarded this project after a robust tender process. Their team delivered this difficult and complex project on time and to the exact standards required. Their assistance in coordinating services and the specialist client suppliers and contractors ensured the projects successful delivery”.
Max Hand | Wieland Hand Property – Project Manager
“RCC made the entire design and construction process streamlined. They are honest and committed to excellence. Their dedication to quality is commendable. A tight time frame for the construction was set. They worked diligently to ensure the completion date was maintained. I found RCC would go the extra mile to meet our needs.”
Jacqui Davies | Alpers Dental